About the Project

Aragon Energy Storage (Aragon) is a 150 MW / 600 MWh energy storage facility ideally located on roughly 13 acres of land in Aragon, Georgia, where it will connect into the Georgia Power 115kV Portland Substation, which is critical transmission infrastructure.

 

About Plus Power

Plus Power develops, owns, and operates utility-scale energy storage facilities that enable a more efficient and reliable electrical grid. The Plus Power team, led by seasoned executives from the renewables and energy storage industry, is accelerating the deployment of transmission-connected battery storage throughout the United States.

Let’s Connect